Description |
Execution Timeline |
Client |
Location / Department |
DIFFERENT CIVIL WORKS FOR THE EXPLORATORY WELL CHIRIGUARO 1 |
2009 |
CEPCOLSA |
CASANARE |
DIFFERENT CIVIL AND ELECTRICAL WORKS FOR THE OCELOTE CPF FIELD, OPERATED BY HOCOL AND ECOPETROL. |
2010 - 2009 |
WOOD GROUP COLOMBIA S.A. |
PUERTO GAITAN - META |
CIVIL WORKS FOR GEOTECHNICAL PROTECTION OF GUANDO FIELD. |
2009 |
PETROBRAS COLOMBIA LIMITED |
MELGAR - TOLIMA |
CIVIL WORKS FOR THE CONSTRUCTION OF LOCATION AND ACCESS ROAD AT ZULIA WEST-3 WELL. |
2009 |
TURKISH PETROLEUM INTERNATIONAL COMPANY LIMITED. |
CUCUTA-NORTE DE SANTANDER |
CIVIL WORKS FOR THE PREPARATION AND EXPANSION OF CHICHEMENE STATION, ECOPETROL VICEPRESIDENCY OF PRODUCTION. |
2009 |
ECOPETROL S.A. |
CHICHIMENE--META |
CIVIL WORKS FOR THE CONSTRUCTION OF RINCON THE SOTAVENTO, 5 RESIDENTIAL BUILDINGS, 140 APARTMENTS TOTAL AND MORE THAN 10.500 SQUARE METERS |
2010 - 2008 |
SOTAVENTO CONSORTIUM |
BOGOTÁ, D.C. |
CIVIL WORKS FOR THE CONSTRUCTION OF THE SAHARA RESIDENTIAL BUILDING, 12 EXCLUSIVE APARTMENTS TOTAL. |
2010 - 2009 |
SERVINCI S.A. |
BOGOTÁ, D.C. |
CIVIL AND MECHANICAL WORKS FOR THE CONSTRUCTION OF IRON AND STEEL PLANT FOR DIACO S.A. |
2009 - 2008 |
DIACO S.A. |
TOCANCIPA - CUNDINAMARCA |
CIVIL WORKS FOR THE CONSTRUCTION OF LOCATIONS AND ACCESS ROADS IN THE CASTILLA-CHICHIMENE FIELD (NINE (9) ADDITIONAL OPTIONS) FOR THE LEAD OPERATIONS OFFICE OF ECOPETROL S.A. IN APIAY. |
2009 - 2008 |
ECOPETROL S.A. |
META |
CONSTRUCTION WORKS FOR WALL REMOVAL AND SLOPE STABILITY AT ISLERO WELL. |
2009 |
HARKEN DE COLOMBIA LIMITED |
VÍANI - CUNDINAMARCA |
CONSTRUCTION OF DRAINAGE WORKS ALONG 1.5KM ON THE ROAD FROM MANI TO PALOBLANCO STATION. MAINTENANCE OF ACCESS ROAD TO CAMPOBLANCO FIELD. SUB-CONTRACTING OF SERVICES FOR WASTE COLLECTION AND REMEDIATION OF RESERVE PIT IN ESTERO. DISPOSAL OF ACCUMULATED WASTE AT THE PALOBLANCO STATION. |
2009 |
HARKEN DE COLOMBIA LIMITED |
MANÍ - CASANARE |
CIVIL WORKS FOR THE CONSTRUCTION AND INSTALLATION OF UNDERGROUND PIPING SYSTEMS FOR ELECTRICAL FACILITIES AT THE MANUELITA S.A. BIODIESEL PLANT. |
2009 - 2008 |
ACEITES MANUELITA S.A./TIPIEL S.A. |
SAN CARLOS DE GUAROA - META |
CIVIL WORKS FOR THE CONSTRUCTION OF BORAL VERTICAL AND TILODIRAN-3 WELLS. |
2008 |
HARKEN DE COLOMBIA LIMITED |
YOPAL - CASANARE |
CONSTRUCTION OF LIMÓN BRIDGE, URIBE HIGHWAY, Y INTERSECTION, ROUTE 65 TO 02 |
2008 |
INVIAS-LIMON BRIDGE CONSORTIUM |
MESETAS - META |
CONSTRUCTION OF ACCESS ROADS AND DIFFERENT RIG FACILITIES AT EXPLORATORY WELLS, IN PUERTO GAITÁN AND LLANOS REGIONS |
2008 - 2007 |
HOCOL S.A. |
META Y CASANARE |
CIVIL WORKS FOR CONSTRUCTION OF LOCATION AND ACCESS ROAD AT CATARTES-1 WELL, IN EXPLORATORY BLOCK PAJARO PINTO. |
2008 |
C&C ENERGY (BARBADOS)-SUCURSAL COLOMBIA |
PAJARO PINTO - CASANARE |
CIVIL WORKS FOR THE CONSTRUCTION OF THREE (3) LOCATIONS AND THEIR ACCESS ROADS, IN EXPLORATORY BLOCK CRAVO VIEJO. |
2008 |
C&C ENERGY (BARBADOS)-SUCURSAL COLOMBIA |
CASANARE |
SERVICES TO MOVE/TRANSPORT GROUND SOIL, FOR THE BIODIESEL PLANT PROJECT OF ACEITES MANUELITA. |
2008 - 2007 |
ACEITES MANUELITA S.A./TIPIEL S.A. |
SAN CARLOS DE GUAROA - META |
CIVIL WORKS FOR THE EXPANSION PROJECT OF THE UNLOADING PLATFORM LOCATED AT VASCONIA PHASE III. |
2008 - 2007 |
ICAMEX-TERMOTECNICA CONSORTIUM |
PUERTO BOYACA - BOYACA |
CEMENTING SERVICES FOR THE FUEL ALCOHOL PRODUCTION PLANT AT HACIENDA CANTA CLARO. |
2007 |
SUMPROCOL S.A. |
PUERTO LOPEZ, META |
CIVIL WORKS FOR THE CONSTRUCTION OF LOCATIONS AND ACCESS ROADS IN THE CASTILLA (CLUSTER VI) FIELD, FOR THE LEAD OPERATIONS OFFICE OF ECOPETROL S.A. IN APIAY. |
2007 |
ECOPETROL S.A. |
CASTILLA - META |
CIVIL WORKS FOR THE MAINTENANCE OF SECONDARY LEVEL ROADS, ACCESS ROADS TO WELLS AND OTHER FACILITIES IN ECOPETROL FIELDS, FOR THE LEAD OPERATIONS OFFICE OF ECOPETROL S.A. IN APIAY. |
2007 |
ECOPETROL S.A. |
CASTILLA - META |
CIVIL WORKS FOR THE CONSTRUCTION OF LOCATIONS AND ACCESS ROADS TO OIL WELLS IN THE APIAY-SURIA FIELD, OPERATED BY THE LEAD OPERATIONS OFFICE OF ECOPETROL IN APIAY. |
2007 |
ECOPETROL S.A. |
VILLAVICENCIO - CASTILLA - META |
CIVIL WORKS FOR THE CONSTRUCTION OF LOCATIONS AND ACCESS ROADS TO LUNA LLENA WELL. |
2007 |
HARKEN DE COLOMBIA LTD. |
PAZ DE ARIPORO - CASANARE. |
CIVIL WORKS FOR THE CONSTRUCTION OF LOCATIONS AND ACCESS ROADS IN CASTILLA FIELD (CLUSTER V). |
2007 - 2006 |
ECOPETROL S.A. |
ACACIAS - META |
CIVIL WORKS FOR THE CONSTRUCTION OF ACCESS ROADS AND ALTERNATIVE ROADS TO ACACIAS STATION. |
2007 |
ECOPETROL S.A. |
ACACIAS - META |